Address Scour.
Protect Vulnerable Infrastructure.
Concentrated flow can threaten the ground supporting an outfall, bank or structure. R.H. Moore helps Florida project teams evaluate ShoreJax concrete armor units and coordinate the product information needed for a site-specific solution.
Concrete Armor for Concentrated Flow
ShoreJax are interlocking concrete armor units offered in multiple sizes. Shoretec describes their use in resisting erosion from high-velocity water, with either random or uniform placement arrangements depending on the application.
Engineers & Specifiers
Define the hydraulic conditions, foundation requirements and acceptance criteria before selecting the unit and arrangement.
Contractors & Estimators
Evaluate delivery, access, handling and placement requirements alongside the proposed protection limits.
Owners & Municipalities
Identify the threatened asset and coordinate inspection access and future maintenance responsibilities.
Match the Protection to the Flow Problem
Manufacturer-listed applications include energy dissipation, streambank and bridge-pier scour protection, toe stabilization, drop structures, weirs and pipe-outfall velocity reduction. Suitability depends on the actual design conditions.
Outfalls & Grade Changes
Show where concentrated discharge or an elevation change exposes the receiving area to erosion. Provide the proposed geometry and available hydraulic analysis.
Banks & Slope Toes
Identify the limits of erosion and the relationship between the bank, toe and adjacent channel. Coordinate surface protection with the broader stability assessment.
Structures & Scour Areas
Document the structure, bed elevations and observed or predicted scour. Have the design team establish the required extent of protection.
Random or Uniform Arrangements
Shoretec describes random placement for applications such as underwater scour holes, and uniform patterns for applications including wave exposure and energy dissipation. The arrangement is a design choice that needs to be reflected in the drawings.
Define the Arrangement
Specify the selected layout, protected limits and acceptance requirements. Do not leave the installation pattern to an unreviewed field assumption.
Coordinate the Foundation
Have the designer establish foundation preparation and any filter or bedding requirements for the site soils and flow conditions.
Resolve the Perimeter
Show transitions, edges and connections to adjacent protection. Address how the system will meet existing ground or structures.
The manufacturer notes that system voids can accommodate soil and vegetation. Confirm whether that treatment is appropriate for the hydraulic exposure and maintenance objectives.
Request Data for the Proposed Unit
Unit Information
Request current dimensions, weights, available configurations and handling details. Confirm that drawings and quoted materials identify the same unit.
Hydraulic Evidence
Ask for applicable performance information and its test conditions. Have the project engineer determine whether it supports the proposed use.
Construction Details
Confirm the placement requirements and any project-specific reinforcement or component details before estimating and procurement.
RHM can help coordinate the manufacturer resources needed for review and pricing. Final selection should follow the project’s engineering requirements.
Plan Access Before Pricing
01 / Establish the Limits
Provide plans, profiles and the dimensions of the proposed protection. Identify tie-ins, structures and any underwater work.
02 / Review Site Access
Show unloading, staging and equipment routes. Confirm the practical handling method using the selected unit’s current data.
03 / Coordinate the Work
Identify water-control needs, construction phasing, access restrictions and required approvals with the project team.
04 / Confirm Acceptance
Agree on the submittal process, installation checks and documentation required before the work is accepted.
Include the Armor in Site Inspections
Have the project team establish an inspection and maintenance plan suited to the location and hydraulic exposure. Include checks after significant flow events where appropriate.
Armor Condition
Record visible damage, displacement or changes in the installed arrangement and refer repair decisions to the responsible team.
Ground & Boundaries
Look for soil loss or changes near the protection perimeter and adjacent structures.
Access & Flow Paths
Address accumulated debris and access constraints through the project maintenance plan. Keep records of observations and corrective work.
ShoreJax FAQs
Are ShoreJax the same as cabled concrete block mats?
ShoreJax are individual armor units placed in a designed arrangement. Compare them with mat systems using the project requirements and current manufacturer details.
Should units be placed randomly or in a uniform pattern?
The manufacturer describes both approaches. The design team should select and document the arrangement for the actual application.
Can I use a single velocity rating to select the system?
Selection requires review of the specific unit, arrangement, hydraulic conditions and supporting evidence. A published headline velocity alone does not establish site suitability.
Can vegetation be incorporated?
Shoretec describes filling voids with soil and vegetation. Confirm suitability and the planting approach for the chosen installation and expected exposure.
What information does RHM need for pricing?
Send the Florida project location, plans, protection dimensions, preferred unit or specification, hydraulic information, access conditions and delivery schedule.
Get Product Information for Review
Manufacturer Overview
Project Documentation
Ask RHM for current unit data, placement details and applicable performance documentation for the proposed scope.
Discuss ShoreJax With R.H. Moore
Share the site conditions, available drawings and infrastructure at risk. RHM can help organize the product review, coordinate technical resources and develop pricing for the selected scope.