GEPS® | Passive Soil Infiltration Enhancement

Get More From the Ground Beneath Your Stormwater System.

Slow-draining soils can limit a pond, pavement or landscape before the rest of the system reaches its potential. Explore GEPS with R.H. Moore to determine whether passive infiltration enhancement is a fit for your Florida project.

Start With the Drainage Challenge

Where Is Slow Infiltration Limiting the Site?

GEPS stands for Groundwater Energy-Passive System. Convergent presents it as a subsurface approach to improving moisture distribution and infiltration in existing soils.

Dry Ponds & Infiltration Basins

Evaluate where slow drawdown is limiting the intended function of a basin. Start with observed conditions and the approved drainage design.

Permeable Pavement & Green Infrastructure

Consider the receiving soil beneath a permeable surface or infiltration practice as part of the complete system.

Nuisance Ponding & Landscapes

Investigate recurring wet areas to determine whether infiltration, grading, groundwater or an obstructed outlet is the controlling issue.

Understand the Approach

A Passive System Installed Below Ground

The manufacturer describes GEPS as an artificial-root-like network of polyethylene units placed in drilled holes. It is intended to redistribute moisture through the surrounding soil without powered pumping.

Below the Surface

A designed arrangement places units within the soil profile. Layout and unit selection are part of the manufacturer’s project review.

Without External Power

The operating concept uses passive soil-water processes rather than an electrical pump.

Within a Site Strategy

Evaluate the soil profile and receiving conditions before deciding how GEPS might support a larger drainage or infiltration plan.

Manufacturer Views

See the Product and Installation Context

GEPS subsurface infiltration units shown by Convergent Water Technologies
GEPS product photograph. Image: Convergent Water Technologies.
GEPS installation illustration from Convergent Water Technologies
Manufacturer installation context. Confirm the actual layout and dimensions for your site.
Evaluate the Potential

Improve Infiltration Without Starting With a Larger Footprint

Make Existing Practices Work Harder

Consider whether the underlying soil is constraining an infiltration practice before comparing expansion or reconstruction options.

Preserve Surface Use

Because units are installed below grade, the concept can be evaluated where surface appearance and landscape use matter. Installation still requires access and drilling.

Compare the Complete Cost

Review investigation, layout, installation and verification alongside alternatives. Evaluate site-specific costs rather than assuming a fixed saving.

Convergent describes infiltration gains of up to 10 times native conditions. That is a manufacturer-reported potential, not a rate to insert into every design. Establish the site’s baseline and confirm how proposed performance will be evaluated.

Before You Specify

Understand Why the Water Is Not Leaving

Soils & Groundwater

Provide borings, soil descriptions, infiltration testing and seasonal groundwater information. Identify restrictive layers or other conditions that affect feasibility.

Water Source & Quality

Identify the contributing drainage area and runoff characteristics. Discuss treatment and groundwater-protection requirements with the project engineer.

Hydraulic & Physical Constraints

Share basin elevations, observed drawdown, overflow and outlet details, utilities and installation access. Include photographs taken after rainfall.

RHM can help organize a focused review with Convergent. Confirm applicable water management district and local criteria before assigning design credit or changing permitted storage.

Manufacturer-Directed Installation

A Designed Layout, Installed by a Licensed Team

The published specification requires Exlterra-licensed installers and manufacturer approval of layout changes. It lists 5- to 40-foot GEPS shaft lengths; the selected layout determines which units are used.

Coordinate the Work

Resolve utilities, drilling access and construction sequencing before installation.

Follow the Approved Layout

Coordinate field conflicts with the manufacturer rather than relocating units without review.

Plan Verification

The specification describes an acclimation period influenced by soil and climate. Establish the performance-evaluation timing and documentation before installation.

Review the Typical Detail and Specifications (PDF) →

Your RHM Project Path

From a Wet Area to a Defined Evaluation

01 / Share the Problem

Describe where water collects, how long it remains and what use or requirement it affects. Send existing plans and available test data.

02 / Review Suitability

RHM can coordinate manufacturer input on the information needed for a proposed application and layout.

03 / Confirm the Scope

Define investigation, installation, acceptance testing and applicable guarantee terms in the project proposal before proceeding.

Questions Before the Next Step

GEPS FAQs

Does GEPS use a pump or electricity?

Convergent describes GEPS as a passive system that operates without external power.

Can it be used beneath an existing stormwater practice?

It may be evaluated for an existing facility. Review the approved plans, soil and groundwater conditions, access and cause of poor drawdown first.

Can I assume a tenfold infiltration rate?

No. Manufacturer-reported potential does not establish a site design rate. Agree on testing and acceptance criteria for the actual application.

Does GEPS remove the need for pretreatment?

Evaluate runoff quality and the full treatment train separately. Infiltration enhancement does not, by itself, establish a pollutant-removal credit.

Is routine maintenance required?

The specification states no additional maintenance is required for GEPS units after installation. Associated basins, inlets, pretreatment and landscape still need their normal care.

What guarantee is available?

Convergent advertises a 20-year performance guarantee. Ask RHM to obtain the applicable written scope, conditions and acceptance criteria for your proposed installation.

Can GEPS be used on any Florida site?

Feasibility depends on the subsurface conditions, runoff, installation constraints and applicable requirements. Begin with a site review rather than a blanket assumption of suitability.

Technical Reference

Review the Manufacturer Information

Use current manufacturer documents with the project’s engineering and permitting review. Request a site-specific layout and clarification of any criteria that affect the proposed design.

Bring Us the Site

Discuss GEPS With R.H. Moore

Have a basin that will not draw down or an infiltration concept constrained by soil performance? Share the site information and the outcome you need.

Send What You Have

Florida project location, drainage and grading plans, soil and groundwater information, test results, ponding photographs and schedule.

Know the Next Step

We clarify the problem, identify information gaps and coordinate the appropriate manufacturer review before developing a recommendation or pricing request.