Erosion Protection
Where Access Is Limited.
A difficult-to-reach slope needs an installation approach that fits the site. R.H. Moore helps Florida project teams evaluate Shoreloc HP hand-placed concrete blocks and coordinate the technical details needed for selection and pricing.
A Hand-Placed Approach to Soil Protection
Shoreloc HP consists of individual concrete blocks placed by hand over a site-selected geotextile. Shoretec identifies smaller areas and locations where cabled mattresses are impractical as key uses. The shaped units interlock while accommodating changes in grade.
Engineers & Specifiers
Evaluate the complete revetment assembly against the site’s hydraulic and geotechnical requirements.
Contractors & Estimators
Review crew access, material staging, block handling and the placement sequence before building the estimate.
Owners & Municipalities
Coordinate the protected limits with access, inspection responsibilities and the surrounding infrastructure.
Match the System to the Site
Manufacturer-listed applications include auxiliary spillways, levees, diversion berms and dam overtopping protection. Each application requires a project-specific engineering review; a listed use does not establish a universal design capacity.
Limited Equipment Access
Determine whether hand placement offers a workable installation route. Review how crews and materials will actually reach the work.
Defined Protection Areas
Measure the surface requiring armor and show the connections to unprotected soil or adjacent structures.
Vegetated Appearance
Shoretec describes openings that can accommodate vegetation. Coordinate infill, planting and establishment with the selected configuration and site conditions.
Blocks, Filter Layer & Prepared Ground
The concrete surface is one part of the protection system. Foundation preparation, filtration and perimeter details need to work together.
Prepared Foundation
Have the design team define grading, subgrade acceptance and treatment of unsuitable material. Identify how water will be managed during construction.
Selected Geotextile
Choose the fabric for the actual soil and hydraulic conditions. Coordinate continuity, overlaps and protection during placement with current approved details.
Interlocking Blocks
Use the specified unit and layout. Confirm block dimensions, weight, handling needs and any connection requirements in the current manufacturer documents.
Crests, Toes & Edges
Detail terminations and transitions so the protection does not end at an unresolved flow path. Address the potential for undermining at the perimeter.
Build a Reviewable Design Basis
Flow & Water Levels
Provide the design flow information, anticipated water levels and any relevant wave exposure. Identify the project’s acceptance criteria.
Slope & Ground Conditions
Supply profiles, slope geometry and available geotechnical information. Resolve foundation stability separately from surface armor selection.
Current Technical Evidence
Request HP-specific drawings and applicable hydraulic test reports. Have the responsible professional verify that the evidence matches the proposed assembly.
Ask RHM to help coordinate the manufacturer information needed for review. Product selection should follow the project’s engineering requirements.
Make Access Part of the Estimate
01 / Confirm the Scope
Show quantities, protected boundaries, proposed details and any phasing or working-hour restrictions.
02 / Plan Material Movement
Identify unloading and staging space, the route to the work and practical handling arrangements for the selected unit.
03 / Coordinate Placement
Use the current approved installation instructions. Resolve foundation preparation, fabric protection, placement sequence and edge details before work starts.
04 / Document Completion
Agree on inspection and acceptance responsibilities. Record the installed limits and establish how future damage or displacement will be reported.
Plan for Inspection & Upkeep
Include the revetment in the owner’s site inspection program. Have the project team establish inspection frequency and any post-storm checks appropriate to the location.
Review the Surface
Look for displaced or damaged units and changes in the protected surface. Refer repair decisions to the responsible project team.
Check the Boundaries
Inspect toes, edges and transitions for exposed fabric, soil loss or changes in the surrounding ground.
Maintain the Intended Condition
Address debris, vegetation and access in accordance with the project maintenance plan. Keep a record of observed changes and corrective work.
Shoreloc HP FAQs
How is Shoreloc HP different from Shoreblock mats?
HP is presented as a hand-placed block system. Shoreblock BD and SD use cabled mat arrangements. Compare the specified assembly and installation requirements before choosing an approach.
Does hand placement eliminate equipment needs?
Plan for delivery, unloading, staging and material movement. The equipment and labor needed depend on the selected units and the actual site access.
Can Shoreloc HP be used on any slope?
Slope suitability requires engineering review of the proposed geometry, ground conditions, hydraulics and termination details. Do not assume a universal allowable slope.
Can the surface support vegetation?
The manufacturer describes openings that can accommodate vegetation. Confirm the chosen configuration, infill and planting requirements with the project team.
What information is needed for a quote?
Send the Florida project location, drawings or protected dimensions, available specifications, access constraints, submittal needs and delivery timing.
Get the Details for Your Review
Manufacturer Overview
Project Documentation
Ask RHM for current unit data, installation details and applicable test documentation for the proposed configuration.
Discuss Shoreloc HP With R.H. Moore
Share the erosion challenge, installation constraints and available plans. RHM can help organize the product review, coordinate manufacturer documentation and develop pricing for the selected scope.